Skip to main content
CUI

CSI Timeline Generator

PNG Generation Unavailable

Timeline PNG generation requires matplotlib which is not available on this server. You can still save dates. To generate PNGs, run locally with: pip install pillow matplotlib

CSI Timeline Generator

Generate a professional PNG timeline. Enter SAV and CSI dates - other phases auto-calculate.

Default: LAB BASELINES / Inspection Timeline

Key Dates (Required)

Enter SAV and CSI dates. Other phases will be automatically calculated using T-minus offsets.

SAV (Security Assessment Visit)

CSI (Cybersecurity Inspection)

Auto-Calculated Phases

These dates are calculated from SAV start. You can override if needed.

1. Physical Security Walkthrough

2 days, 2 months before SAV Prep

2. Contributing Factors Walkthrough

1 day, after Physical Security

3. Technical Assessment

First 5 days of SAV Prep

4. SAV Prep

60 days before SAV to SAV Start

6. Post SAV CSI Prep

SAV End to CSI Start

Preparation Deliverables

Due dates are calculated from SAV/CSI anchor dates using the CSI Preparation Timeline worksheet. Only rows marked for timeline graphic appear on the PNG chart.

Effective Due Anchor Days Out Deliverable Status Include in PNG Task
CSI T-200 POC Designation FCC/OCA Action Officer will contact the scheduled command to obtain POC information.
CSI T-180 Notification Email FCC/OCA Director or Deputy will transmit notification to include documents (RFI and the Preparation Timeline).
CSI T-150 ACAS Scan Results Site will post .CSV file to the OCA A&A SharePoint Page.
SAV T-55 RFI Form FCC/OCA Action Officer will obtain the completed RFI Form from unit.
SAV T-50 Foreign Travel Document (if req'd) FCC/OCA Action Officer provide document to CSI team members. APACS submission for Team members. (N/A if not applicable).
SAV T-50 Scoping Document Review (SAV) Assigned Team Lead will review scoping artifacts and contact AO to schedule in-house scoping meeting.
SAV T-45 Internal Scoping Meeting Assigned Team Lead will conduct a scoping meeting with assigned reviewers.
SAV T-40 External Scoping Teleconference Assigned Team Lead will conduct a scoping teleconference with Site.
SAV T-30 Reserve In brief and Out brief Locations (SAV) FCC/OCA Action Officer and scheduled site prepare and reserve locations for the in brief and out brief.
SAV T-30 Final Logistics Visit Requests and additional logistics sent to site. OCA provides site reciprocity memo for NIPR/SIPR user accounts.
SAV T-15 Final Logistics Meeting FCC/OCA Action Officer coordinates teleconference with scheduled site and Team Members.
CSI T-75 Foreign Travel Document FCC/OCA Action Officer provide document to CSI team members. APACS submission for Team members. (N/A if not applicable).
CSI T-30 Reserve In brief and Out brief Locations FCC/OCA Action Officer and scheduled site prepare and reserve locations for the in brief and out brief.
CSI T-30 Final Logistics Visit Requests and additional logistics sent to site. OCA provides site reciprocity memo for NIPR/SIPR user accounts.
CSI T-15 Final Scoping/ Logistics Meeting FCC/OCA Action Officer coordinates teleconference with scheduled site and Team Members.
Back to Reports
15 days 30 days 60 days 90 days
CUI